Short answer: AHD stands for Australian Height Datum, the national height system used on survey plans across Australia. An AHD level tells you how high a point is in metres above a fixed national reference close to mean sea level. In Geelong you will most often need AHD levels when your land is in a flood or inundation overlay, when an authority has given you a minimum floor level, or when your designer must match a driveway, drain or floor to the street. A licensed land surveyor provides AHD levels as part of a feature and level survey.
Many Geelong owners first see “AHD” on a permit condition, a flood level letter or their designer’s drawings. This guide explains AHD levels in plain words, how they differ from a site datum, when they matter for Geelong homes and developments, and how to get accurate levels for your project.
What is the Australian Height Datum?
The Australian Height Datum (AHD) was introduced in 1971 as the official vertical datum for Australia. It combined decades of state and territory levelling work and was fitted to mean sea level observed at 30 tide gauges around the mainland coastline. Tasmania has its own version of the datum.
In practice, AHD gives everyone the same starting point. A level in metres AHD on your survey can be compared directly with a flood level, a council drainage plan or a neighbouring site, which is why councils, water authorities, engineers and land surveyors use it.
How AHD levels appear on a survey plan
On a feature and level survey you will see levels as numbers beside spot heights and contour lines, with a note on the plan stating the datum. Common labels include:
- RL (reduced level): the height of a point, for example RL 12.35 means 12.35 m above the datum.
- NGL (natural ground level): the existing ground surface.
- FFL (finished floor level): the level of a floor, existing or proposed.
- Kerb levels: levels along the kerb and channel at the street.
- Pit and invert levels: the top of drainage pits and the level of the inside base of pipes, where they can be accessed.
The numbers above are only examples. Your plan’s notes will always say whether the levels are on AHD or on an assumed datum.
AHD levels versus an assumed site datum
Not every project needs AHD. For many jobs, a land surveyor sets up a temporary benchmark on site and gives it an assumed value, often a round number such as 100.00. Every level on the plan is then measured relative to that point. That is fine for showing the fall of a block or the height of a neighbour’s window.
The limitation is that an assumed datum cannot be compared with anything outside the site. If a flood level, a council drainage level or a sewer connection depth is given in metres AHD, your survey needs to be on AHD too, otherwise the numbers do not line up.
When Geelong properties need AHD levels
Flood and inundation overlays
Parts of Greater Geelong near the Barwon River, Moorabool River, creeks, wetlands and low-lying coastal land are covered by planning overlays for flooding, such as the Land Subject to Inundation Overlay. Where these apply, the floodplain management authority or council may issue a flood level in metres AHD and require new floors to be set a certain height above it. A flood level survey records your ground and floor levels on AHD so they can be compared directly with that flood level.
Coastal properties
Around the Bellarine Peninsula and Surf Coast, low-lying coastal land can be affected by coastal inundation planning. Victorian planning policy asks decision makers to plan for sea level rise of not less than 0.8 metres by 2100, and flood and coastal levels issued by authorities are normally given in metres AHD. If you are building in a low-lying part of a coastal town such as Ocean Grove, AHD levels help your designer and the relevant authorities assess the site on the same basis.
Driveways and vehicle crossings
A driveway has to meet the street at a sensible level and grade. New or altered vehicle crossings over the nature strip and footpath generally need council approval, and council can set requirements for levels at the property boundary. A feature and level survey that picks up kerb, footpath and nature strip levels lets your designer check the driveway grade and keep stormwater out of the garage. Steep blocks need particular care, and our retaining wall survey guide covers related level issues.
Stormwater and sewer connections
Stormwater must flow by gravity to the legal point of discharge nominated by council, and sewer drains must fall to the connection point for the property. Designing floors, pipes and pits with levels that can be compared with street drainage and sewer information helps find fall problems on paper instead of on site.
Subdivisions and larger developments
Engineering plans for subdivisions and unit sites usually design roads, drainage and lot levels on AHD so they connect with existing council and water authority infrastructure. Your planning permit survey can be set up on AHD from the start if engineering design is likely to follow.
How a land surveyor provides AHD levels
- Find nearby survey marks. Land Use Victoria maintains a network of permanent survey marks, and its Survey Marks Enquiry Service lists marks with known positions and, where established, AHD heights. We also explain marks in our survey pegs guide.
- Connect the site to the marks. The surveyor measures from one or more of these marks to your site using levelling, total station or GNSS techniques suited to the accuracy needed, and checks the result.
- Set a site benchmark. A benchmark on or near the site is given its AHD value so builders and other consultants can work from it later.
- Survey the site. The feature and level survey picks up ground levels, floor levels, kerbs, pits, trees, buildings and relevant neighbouring features.
- Deliver the plan. You receive a survey plan, with CAD files if your designer needs them, and the datum clearly noted.
When construction starts, a building set-out survey can mark the approved floor or slab level from the same benchmark, so the design levels are built as intended.
Tips before you order a survey
- Download a planning property report from VicPlan to see whether flood, inundation or other overlays affect your land.
- If you already have a flood level, permit condition or authority letter, send it to us with your quote request.
- Tell your designer and land surveyor the same thing: whether levels need to be on AHD.
- Keep the site benchmark in place during design and construction if you can.
Our older article on the value of a features and levels survey explains why accurate site information saves time later, and our Geelong land surveying page lists the areas we cover.
Need AHD levels for a Geelong property? Request a quote online or call 0412 722 261 and tell us the address and what you are planning.
Frequently asked questions
What does AHD stand for?
AHD stands for Australian Height Datum, the national system for measuring heights in Australia. Levels on survey plans are usually shown in metres AHD.
Is 0 m AHD the same as today’s sea level?
Not exactly. Zero AHD was set from mean sea level measured around the time the datum was established, so it is close to average sea level but is not the same as the tide on any given day or future sea levels.
Do I need AHD levels for my project?
You usually need them if your land is affected by a flood or inundation overlay, if an authority has issued a minimum floor level, or if your designer needs to match levels to the street, drains or sewer. For many simple projects an assumed site datum is enough.
Can I work out AHD levels from a GPS app or Google Earth?
No. Phone and mapping heights are not accurate enough for floor levels, drainage or flood requirements. A land surveyor connects your site to survey marks with known AHD heights.
How do I get AHD levels for my Geelong property?
Ask for a feature and level survey on AHD. Send us your address and what you are planning through our contact page or call 0412 722 261, and we will confirm the right survey and provide a quote.